Sector

Commercial & Institutional

SCOPE
Size:
25,000 SF
Completion: 2023

SERVICES PROVIDED
Architecture
Mechanical Engineering
Electrical Engineering

Interior Design

PARTNERED WITH
S.E.M Construction
Centric Engineering
JLL

 

WalterFedy undertook the complete retrofit of the PowerCo workplace at 800 Talbot Street, transforming a 25,000-square-foot warehouse into a modern office space that reflects PowerCo’s innovative culture and commitment to environmental sustainability. The design seamlessly blends functionality with aesthetics, featuring newly added windows and a modified façade to create a welcoming exterior. The character of the interiors reflects PowerCo’s vibrant brand through electric accent colours and by implementing biophilic design strategies, such as visual connections to nature and enhancing access to natural light. The design features a 2-storey moss wall that connects both levels of the office with surrounding wood features. The programming and layout of their new office reflects their value of collaboration by including a collaborative district, work café, and private project rooms. These energetic spaces were strategically located within the core of the floor plan to optimize the office’s acoustics and reduce noise within the open office workstations and the quiet district, which are positioned towards the perimeter. Overall, the design of the PowerCo workplace successfully blends sustainable design strategies into the sophisticated design, providing a dynamic and inspiring environment that reflects the company’s forward-thinking values and fosters productivity and well-being. 

You might also enjoy

View More

Commercial & Institutional

Training Facility

International Union of Operating Engineers (IUOE)

Education

Hunt Club Public School

Waterloo Region District School Board

Education

St. Kateri Tekakwitha Catholic Elementary School Addition

Durham Catholic District School Board