Sector

Commercial & Institutional

SCOPE
Size:
173,550 sq. ft.
Value: $39 Million
Status: Ongoing

SERVICES PROVIDED
Architecture
Energy and Carbon Solutions/Energy Engineering
Mechanical Engineering
Electrical Engineering
Structural Engineering
Civil Engineering

OWNER
City of Brampton

As we proceed with construction, our dedication to retrofitting existing buildings remains crucial for combating climate change and curbing carbon emissions. At the Susan Fennel Sportsplex in Brampton, our focus on innovative energy and carbon solutions is driving an 80% reduction in the onsite carbon footprint, paving the way for us to achieve full net-zero status.

It’s worth noting that the Susan Fennel Sportsplex is not only a flagship project in Brampton’s efforts to address climate change but is also recognized as one of the city’s largest greenhouse gas emitters.

Phase One: Feasibility Study 

In this initial phase, a comprehensive audit and study of the facility was conducted to identify measures for carbon reduction. The study analyzed capital costs, carbon reduction, energy savings, and maintenance impacts.  

We compiled the findings into a comprehensive zero-carbon scenario for presentation to Johnson Controls and the City of Brampton for formal approval. This research enabled them to apply for a grant through the Green and Inclusive Community Buildings Program to offset the project’s capital cost.   

Phase Two: Design  

During phase two, our Energy and Carbon Solutions team works to design features that seamlessly fit into the building and will contribute to carbon reduction. Features such as a geothermal system, solar PV, CO2-based refrigeration, electric heat pumps, and more. This will assist in achieving an 80% reduction.  

The team focused on eliminating the use of natural gas, optimizing for energy efficiency with a geothermal system and a solar thermal system that uses renewable energy to heat and cool the building throughout the year. 

Current Phase – Three: Construction 

Phase three is where we currently are and where the project comes to life! In this phase, the Sportsplex will undergo a significant renovation and retrofit to implement energy-efficient features planned during phase two. This phase lasts 18 – 24 months and results in a state-of-the-art facility ready for the community to enjoy! 

Facility Enhancements

  • 4 Ice Rinks
  • 1 Lap Pool
  • 1 Leisure Pool
  • Fitness Centre
  • 2 Multi-purpose Rooms (capacity of: 70 and 110)
  • Auditorium (capacity of: 100)
  • Snack Bar
  • Brampton Public Library
  • Hot Tub
  • Youth Hub
  • Basketball Court (outdoor)
  • 1 Lit Baseball Diamonds
  • Leash-free Dog Park
Copyright © 2024 WalterFedy. All rights reserved.