Dingle Creek Bank Stabilization

Norfolk County

Size: Project Area: 915 m | Value: $1.5 Million | Location: Norfolk County

Civil Engineering

The Dingle Creek watershed is approximately 402 hectares in size and has agricultural, commercial, and residential land uses. Significant development within the watershed has occurred over the past 20 years, and the increased development within the watershed increased peak flow rates and resulted in erosion problems in the downstream portion of Dingle Creek. In addition to increased peak flow rates, development within the Dingle Creek watershed has reduced infiltration and groundwater discharge to the creek.  

 

WalterFedy’s civil engineers were retained to prepare an existing conditions hydrologic model of the Dingle Creek watershed to assist in determining potential impacts further development may have on the creek system. The scope of work  included preparation of a continuous monitoring program to collect data used to calibrate a continuous storm water model.  The model was used to design natural bank stabilization measures along a stretch of 915 meters in a deeply incised ravine between homes on a number of private properties. This project incorporates a significant public consultation component because all bank stabilization works will be performed on private property.

 

The hydrologic analysis prepared as part of this analysis will assist the County in review of development applications within the watershed through establishment of baseline conditions against which future development applications may be compared. Specifically, it was used to design bank stabilization measures proposed in Dingle Creek between the Lynn River and Highway 3. 

Focus on functionality to create innovative results
January 04, 2021 | by: Louise Frost
     ATS is an industry-leading automation solutions provider for many of the world’s most successful companies. Since the Waterloo Region is known as the “Silicon Valley...
Read more >>
New ecosystem breathes new life into Cambridge subdivision
November 19, 2020 | by: Katie McQuaid
  There is a lot more to creek design than meets the eye. When our Water Resources team was tasked with taking a Cambridge stormwater pond offline to make way for a more diverse creek ecos...
Read more >>
WalterFedy and AEC Announce New Shareholders
November 12, 2020 | by: Business Development
  KITCHENER, Thursday, November 12, 2020 – The WalterFedy Board of Directors is pleased to announce three new shareholders are joining our ownership team. Congratulations to Patrick ...
Read more >>